Kannjane Consultants

Kitchens

What a Kitchen Renovation Really Costs in SA (2026)

13 August 2026 · 8 min read

If you've been Googling kitchen renovation costs, you've probably noticed the numbers bounce around like a tennis ball. R30,000 here, R300,000 there. Both figures are real — they just describe completely different jobs. So what is the kitchen renovation cost in South Africa right now? The honest answer is a range: R60,000 to R250,000 and beyond, depending on size, materials and how much plumbing and electrical work you're willing to take on.

This guide gives you the straight story — real per-metre prices, what labour actually costs, and the hidden expenses most quotes don't spell out. And because we're based in Komani (Queenstown) in the Eastern Cape, we'll keep it grounded in small-town reality, not Cape Town showroom numbers.

The short answer: R60,000 to R250,000+

National guides put a complete kitchen fit-out at roughly R50,000 to R150,000. Full renovations — new cabinetry, countertops, appliances, moved water points and fresh tiling — can easily run from R60,000 up past R250,000. That's a wide window, but the gap is explainable.

  • Size: a galley kitchen in a two-bedroom house versus a farmhouse kitchen with an island
  • Materials: melamine units versus solid timber, laminate versus stone tops
  • Scope: like-for-like replacement versus moving walls, windows and water points
  • Appliances: whether the quote includes them, and at what spec

Kitchen cupboards per metre: the price that matters

Cabinetry in South Africa is priced per linear metre, and this is the number you need before you compare any two quotes. At Kannjane, custom kitchen cabinetry runs R9,000 to R15,000 per metre, built, fitted and installed.

A compact kitchen is often around three metres of cabinetry; a family kitchen runs four to five. Do the maths — three metres at R9,000 is R27,000, and five metres at R15,000 is R75,000. That's why two "R60,000 kitchens" can look nothing alike.

Why does the per-metre price vary?

  • Board quality: 18mm melamine is the workhorse; moisture-resistant and wood-veneer boards cost more
  • Hardware: soft-close hinges and full-extension drawer runners add up fast
  • Doors and finishes: solid timber doors and sprayed finishes cost far more than standard laminate
  • Details: plinths, cornices, cut-outs for sinks and hobs, lighting

Labour, plumbing and the hidden costs

Day labour for a skilled carpenter runs R1,100 to R1,600 a day, and on most kitchen jobs it's bundled into the per-metre price rather than charged separately. But there are costs that sneak in around the edges:

Moving a sink means moving a water point — re-piping a section of the house runs R6,000 to R15,000. Electrical changes (new plugs, extractor wiring, lighting) need a registered electrician and a COC. Tiling, backsplashes and painting are usually separate trades. And removing and dumping the old kitchen is often forgotten until day one.

Smaller built work adds up too: a full timber fit-out of a small room runs R15,000 to R25,000. The lesson is simple — get a quote that itemises what's in and what's out, in writing, before you commit. And if you're pricing built-in cupboards for the rest of the house at the same time, our per-metre guide covers what those should cost.

How long does a kitchen fit-out take?

Most kitchen fit-outs take one to three weeks. A like-for-like cupboard swap with no plumbing or electrical moves can be done in a week. A full renovation with moved water points, new tiling and a stone countertop pushes closer to three.

Two things slow jobs down in small towns: stone top lead times and appliance delivery. Order your countertop and appliances early, and ask your builder to sequence the job so the team isn't sitting idle waiting for a slab.

Do you need municipal approval?

For a like-for-like internal renovation — new cupboards, new tops, same layout — you generally don't need municipal approval. You do need it if you're moving walls, relocating water points or changing windows, because that alters the structure and the approved plans.

Electrical work must be signed off with a Certificate of Compliance (COC) by a registered electrician. Plumbing that changes supply lines should be done by a PIRB-registered plumber. These certificates protect you — and they matter when you eventually sell.

Kitchen renovations in Komani, Queenstown and the Eastern Cape

Here's the small-town reality: you don't have ten suppliers bidding for your job like you do in Johannesburg. You have a few decent teams, and the good ones book up. That makes it worth choosing a full-service outfit that handles the carpentry, plumbing and building under one roof — one quote, one team, one person to hold accountable.

Kitchen renovation costs in the Eastern Cape are driven by the same materials as anywhere else, but labour rates sit lower than the metros — and so does the risk of hiring someone who disappears mid-job. Kannjane Consultants does full kitchen work in Komani, Queenstown, Ezibeleni and the wider Eastern Cape: custom kitchens, built-in cupboards, joinery, plumbing and renovations. Local clients rate us 4.6 out of 5, and most of our kitchen work starts with a site visit rather than a phone estimate, because no two kitchens are the same.

Frequently Asked Questions

Quick answers to the questions we get asked most. If yours isn't here, send it through on WhatsApp and we'll give you a straight answer.

How much does a new kitchen cost in South Africa?

A full renovation runs from about R60,000 to R250,000 and beyond. The cabinetry is the biggest line item by far, so the per-metre price drives the whole budget.

How much do kitchen cupboards cost per metre?

At Kannjane, custom kitchen cabinetry runs R9,000 to R15,000 per metre, built, fitted and installed. The range depends on board quality, hardware and finishes.

How much do built-in cupboards cost per metre?

R4,500 to R8,000 per metre, installed — that's the standard range for bedroom cupboards, studies and similar built-ins.

How much does a kitchen installer charge for labour?

Skilled day labour runs R1,100 to R1,600 a day. On most kitchen quotes it's bundled into the per-metre price rather than charged separately.

How long does a kitchen fit-out take?

One to three weeks is typical. Simple cupboard swaps take about a week; full renovations with moved plumbing and stone tops run closer to three.

Do I need municipal approval for a kitchen renovation?

Not for like-for-like internal work. You do need approval if you're moving walls, water points or windows, and electrical work needs a COC.

Can I get a free quote in Komani?

Yes. Kannjane offers free site visits in Komani, Queenstown and the surrounding areas — WhatsApp 083 525 9808 to book one.

Get a real kitchen quote — free site visit

Free quotes, straight answers

Get a free quote — no obligation.

Tell us what you're planning and we'll come out, measure up and give you a straight answer. Quotes are free, and you'll know exactly what the job costs before we start.

Serving Komani (Queenstown), Ezibeleni and the surrounding Eastern Cape area.